ISO 7 EPS Top Portable Modular Wall Hospital Hospital Sale Pharmaceutical Air Shower Clean Room

200.0 Square Meters
MOQ
ISO 7 EPS Top Portable Modular Wall Hospital Hospital Sale Pharmaceutical Air Shower Clean Room
Eigenschaften Galerie Produkt-Beschreibung Fordern Sie ein Zitat
Eigenschaften
Technische Daten
Condition: New
Applicable Industries: Manufacturing Plant, Food & Beverage Factory, Pharmaceutical Plant
Weight (KG): 1
Showroom Location: None
Video outgoing-inspection: Provided
Machinery Test Report: Provided
Marketing Type: Hot Product 2019
Warranty of core components: 1 Year
Core Components: Purification
Warranty: 1 Year
Type: Clean Room Project
Application: Hospital,Clean Room
Model Number: CRP01
Size: Cusomerized
Sealing Strip Material: Rubber-plastic
Power: As Per Size
Material: Sandwich Panel of the Structure
Installation Period: 15 days
Function: Purification Filter
Grundinformation
Model Number: CRP01
Zahlung und Versand AGB
Packaging Details: Wooden case&Wooden pallet
Supply Ability: 10000 Square Meter/Square Meters per Week
Produkt-Beschreibung
Specification:
What is clean room?
Clean Room is also called clean workshop and dust-free workshop, which refers to the removal of particles, harmful air, bacteria and other pollutants in the air within a certain space, and the indoor temperature, cleanliness, indoor pressure, air flow Speed and airflow distribution, noise and vibration, lighting, and static control are within a certain range of requirements, and are given a specially designed room. That is, no matter how the external air conditions change, the room can maintain the characteristics of cleanliness, temperature, humidity, and pressure that were originally set.

What is the composition of the clean room?
The clean room construction method can be divided into two types: civil structure and assembly type, of which assembly type is generally used. The prefabricated clean room system is mainly composed of:
1. Air-conditioning supply and return air and exhaust systems with primary, middle, and high-level air filtration;
2. Power and lighting systems; monitoring, alarm, and communication systems for working environment parameters;
3. People flow and logistics systems;
4. Process pipes Road system;
5. The implementation content required by various aspects such as maintenance structure and electrostatic ground treatment, forming the whole equipment and equipment supporting and construction installation content included in the air conditioning purification system project.
Cleanliness
Available from Class 100 to Class 10000





Design Scope(from structure, HVAC,electric to auto-control)
1. Structure: Wall Panel, Ceiling Panel, Windows, Doors, Various Fittings, Flooring
Core Material
2. HVAC: AHU, Ducting, Piping, Chiller, dehumidifier, etc.
Length
3. Electric: Lighting, Switch, Cables, Wires, Power Distribution Cabinet, etc
Thickness
4. Auto-control: PLC Controller, Sensors for Humidity and Temperature, Control Panel
Width
5. Medical Gas System: Medical gas terminal, medical gas pipeline
Temperature
21-27℃ (or as per required)
Humidity
30-60℃ (or as per required)
Application
Operation Theatre, Medical Center, ICU, etc.
What we can do for your clean room project?
1. We have specialized designer to work out the optimal drawing for your project.
2. We have meticulous cost engineer to meet your budget.
3. We own our production capacity to provide the products with nice quality and reasonable price.
4. We have top-ranking installation team for both domestic and oversea projects.
5. We have strong after-sales team to maintain and teach you how to let your clean room have longer life-time.
Clean room service process
Diagram:
What dose the clean room look like?
Details:
Installation procedure:
Certification:
Exhibition:
Q:Where have you exported your equipment?
A:We've already exported to more than 30 countries in Asia, Europe, Middle East,Africa,South America.etc.

Q:Can you arrange the visit to your user?Can you customized the machine according to our requirements?
A:Yes,Of course!

Q:Is your equipment in accordance with GMP,ISO?
A:Yes,we will design and manufacture the equipment according to the requirement of GMP/ISO in your company.

Q:How about your after sale service?
A:We will reply you within 24hours by email or phone.
If we have local agent,we will arrange him to your site within 24 hours to assist you to shoot the problem.

Q:How about the staff training?
A:Normally,we will train your staffs during the installation in your site,you are also welcome to send your staff train in our factory.

Q:Which kind of after-sales service you can offer?
A:Except the regular service ,we can also provide you know-how transfer, and dispatch our qualified engineers to help you run the factory up to 6-12 months.
Empfohlene Produkte
Nehmen Sie Kontakt mit uns auf
Ansprechpartner : Charlene
Zeichen übrig(20/3000)